Many infrastructure systems require permitting before construction and the sites need to consider the potential implications of New Source Review (NSR), Prevention of Significant Deterioration (PSD), Title V and other regulations. One of the best methods to address these regulatory permitting concerns is to develop a planning model that determines the required limits or technologies necessary to meet utility loads and other project constraints.
ASH Consulting Group, L.L.C. staff has experience in developing planning models for the following types of combustion sources:
| Boilers from 10 MMBtu/hr to 338 MMBtu/hr (coal, fuel oil, natural gas, and wood waste) |
| Cogeneration units up to 5.5 MW (fuel oil and natural gas) |
| Emergency generators up to 1.5 MW (fuel oil and natural gas) |
| Incinerators up to 20 tons per day (medical waste, municipal waste, government-based materials, and veterinary) |
The staff has permitted the following types of air pollution sources and capacities:
| Boilers from 1.5 MMBtu/hr to 338 MMBtu/hr (coal, fuel oil, natural gas, and wood waste) |
| Cogeneration units up to 5.5 MW (fuel oil and natural gas) |
| Emergency generators up to 1.5 MW (fuel oil and natural gas) |
| Incinerators up to 7.3 MMBtu/hr (medical waste, government-based materials, and veterinary) |